Hear this out loudPauseThe line is being opened in stages, beginning with Stage 1 on 31 January 2020. Stage 2 opened on 28 August 2021 and Stage 3 opened on 13 November 2022. Stage 4 and Stage 5 are scheduled to open sometime in 2024 and 2025 respectively.
Which 11 new Thomson East Coast Line MRT stations are on track to open by end of year?
Hear this out loudPauseThe new Thomson-East Coast Line stations are: Stevens, Napier, Orchard Boulevard, Orchard, Great World, Havelock, Outram Park, Maxwell, Shenton Way, Marina Bay and Gardens by the Bay.
How long does it take to travel the Thomson East Coast Line?
about 49 minutesHear this out loudPauseTraveling from one end to the other takes about 49 minutes. The line is currently 29.3 km long with 20 stations and it is fully underground and automated.
Is Great World City MRT opened?
Hear this out loudPauseFirst announced in August 2012 as part of the Thomson line (TSL), the station was constructed as part of TEL Phase 3 (TEL 3) with the merger of the TSL and the Eastern Region line. The station opened on 13 November 2022 with only two out of five entrances completed due to construction difficulties at the site.
Is Thomson line opening on November 11?
Is Thomson East Coast line faster?
Hear this out loudPauseThomson-East Coast Line (TEL) is a 43-kilometer fully underground train line that brings faster access to the city, the Central Business District (CBD), and developments in the Marina Bay area for Singapore residents in the east and along the North-South Corridor.
Is the Downtown Line fully open?
Hear this out loudPauseIt opened for passenger service on 21 October 2017, becoming the world's longest fully underground and fully automated rapid transit line, with over 34 stations across 41.9 kilometres.
How long does the Downtown Line take?
Hear this out loudPauseDowntown Line (DTL) is the fifth Mass Rapid Transit (MRT) line. Traveling from one end to the other will takes about 70 minutes. The line is currently 40.6 km long with 34 stations and it is fully underground and automated.
Is the TEL mrt line open?
Hear this out loudPauseThe Thomson-East Coast Line Stage 3 (TEL3) has opened for passenger service on 13 November 2022.